Mira Loma Detention Center Rehabilitation

 

Owner : County of Los Angeles
Contact : Gregg S. Williams | (310) 828-0040
Year Started : January 2008
Year Constructed : On-going
Project Cost : $40M
Contract Amount : $216,090.00
Address : 45100 N. 60th Street, Lancaster, CA 93536
Client : DLR Group Inc. of California
3130 Wilshire Blvd., 6th Floor, Santa Monica, CA 90403

Project Description:

The County of Los Angeles Department of Public Works (LADPW) and the Los Angeles Sheriff’s Department (LASD), working in cooperation with Los Angeles Chief Executive Office (LACEO), identified the expansion of the Mira Loma Detention Facility as one way to relieve overcrowding and provide interim capacity to allow the renovation of the Men’s Central Jail.

VCA’s Role:

The scope of work include, but not limited to, the following: 1) review initial data as provided by the architect such as architectural site plan, topographical survey, utility investigation reports, as-built drawings, and soils report, 2) attend kick-off meetings, 3) facilitate site visits and note existing conditions, 3) perform initial investigation of existing utilities, 4) perform determination, compilation, and research on the ownership or jurisdictional agency of the existing utilities, 5) prepare a summary report outlining existing utilities at the site, 6) assist in developing Site Alternatives based on site and existing utility analysis, and 7) assist in quantity takeoff for cost analysis.

 
 