LACMTA Patsaouras Plaza Busway Pavers, Storm Drain Repairs, and Improvements

Description

Metro has reconstructed Patsaouras Plaza by Vignes Street. The project included privately-owned vehicle pickup/drop-off area and repairs busway pavers and storm drains. VCA Completed construction documents depicting site demolition, architectural site plan and details, structural drawings and calculation, site horizontal and vertical control, site paving, grading and drainage with local storm water management design (LID), utility plans and profiles.

Information

Project Owner: Metropolitan Transportation Authority
Client:
AP Construction